Product Details


Specifications
| Gross Dimension(W x D x H) | 12192mmx2438mmx2896mm | 
| Gross Weight | Approximately 13 Tons | 
| Miner Capacity | 252 PCS 2U | 
| Input Voltage | CE: 380V±5%@50Hz, UL: 415V±5%@60Hz | 
| Operating Power | 2030kW | 
| Heat Dissipation Options | Dry-Cooler / Cooling Tower / Hybrid Cooling System / Heat Recovery System | 
| Cooling Medium | Softened Water /Antifreeze Fluid | 
| Electrical Code | Core Electrical Components Passed UL Or CE Compliant. | 
| Transportation Standard | CCS | 
| Working Temperature | -25~45℃ | 
| Monitoring Content | Industrial PC, Temp & Humidity Monitoring Through Web/APP, Pressure Sensor, Water Immersion Sensor, Smoke Alarm, Error Light, Smart PDU, Multifunctional Power Meter | 
Notes
• The product must remain vertical during installation (level tolerance: ±1°).
• The ground must be reinforced to support a load of 35 tons.
• Operating Environment Temperature: -25°C to 45°C (with a counterflow closed cooling tower). For temperatures between -25°C and 35°C, maintain relative humidity between 10% and 90%. For temperatures between 35°C and 45°C, maintain relative humidity between 10% and 55%. Please take precautions against condensation in low-temperature conditions.
• When the altitude exceeds 2000 meters, consider reducing the transformer and switches, with approximately 1% reduction for every additional 100 meters.
• The product’s operating environment temperature does not equate to the server’s operating environment temperature.
• This container data center provides three-phase distribution panels, power outlets, network equipment, server racks, exhaust fans, and more. If there are additional needs, we can also provide technical support.
• When the ambient temperature is below 0°C, ensure that the internal circulation cooling liquid is selected based on the environmental temperature to avoid freezing and damage to the cooling tower.
• For counterflow closed cooling towers, please refer to the water quality requirements in the specification sheet to prevent corrosion and scaling.
Warranty
• A one-year warranty period, beginning on the day of delivery notice.
$149,999

Miner Capacity:252 PCS
Dimension:≈12*2.4*2.9M
Shipping Info.:Upon receiving full payment, item will be dispatched within 45 working days.
Payment Method:BTC|BCH|ETH|LTC|USDT|USDC|USD


| Gross Dimension(W x D x H) | 12192mmx2438mmx2896mm | 
| Gross Weight | Approximately 13 Tons | 
| Miner Capacity | 252 PCS 2U | 
| Input Voltage | CE: 380V±5%@50Hz, UL: 415V±5%@60Hz | 
| Operating Power | 2030kW | 
| Heat Dissipation Options | Dry-Cooler / Cooling Tower / Hybrid Cooling System / Heat Recovery System | 
| Cooling Medium | Softened Water /Antifreeze Fluid | 
| Electrical Code | Core Electrical Components Passed UL Or CE Compliant. | 
| Transportation Standard | CCS | 
| Working Temperature | -25~45℃ | 
| Monitoring Content | Industrial PC, Temp & Humidity Monitoring Through Web/APP, Pressure Sensor, Water Immersion Sensor, Smoke Alarm, Error Light, Smart PDU, Multifunctional Power Meter | 
• The product must remain vertical during installation (level tolerance: ±1°).
• The ground must be reinforced to support a load of 35 tons.
• Operating Environment Temperature: -25°C to 45°C (with a counterflow closed cooling tower). For temperatures between -25°C and 35°C, maintain relative humidity between 10% and 90%. For temperatures between 35°C and 45°C, maintain relative humidity between 10% and 55%. Please take precautions against condensation in low-temperature conditions.
• When the altitude exceeds 2000 meters, consider reducing the transformer and switches, with approximately 1% reduction for every additional 100 meters.
• The product’s operating environment temperature does not equate to the server’s operating environment temperature.
• This container data center provides three-phase distribution panels, power outlets, network equipment, server racks, exhaust fans, and more. If there are additional needs, we can also provide technical support.
• When the ambient temperature is below 0°C, ensure that the internal circulation cooling liquid is selected based on the environmental temperature to avoid freezing and damage to the cooling tower.
• For counterflow closed cooling towers, please refer to the water quality requirements in the specification sheet to prevent corrosion and scaling.
• A one-year warranty period, beginning on the day of delivery notice.