BTC Mining Data Overview

price

BTC Price

$87,139.87

fpps

Daily Earnings

$0.0373/T

hashrate

Network hash rate

1061.05 EH/s

difficulty

Difficulty

148.26T

Daily Earnings

Hash Rate Trend

Difficulty Trend

Daily earnings for the past 30 days

Popular Mining Rigs

Mining pool Fee:
%
Electricity Fee($):
kW.h
Miner Coin Hash Rate Power Efficiency Net Revenue Electricity % Shutdown Price
SEALMINER A3 Pro Hyd
BTC
660.00T
12.5W/T
$11.14
53.61%
$46,934.30
SEALMINER A3 Pro Air
BTC
290.00T
12.5W/T
$4.89
53.61%
$46,934.30
SEALMINER A3 Hyd
BTC
500.00T
13.5W/T
$7.66
57.90%
$50,689.04
SEALMINER A3 Air
BTC
260.00T
14.0W/T
$3.78
60.05%
$52,566.41
SEALMINER A2 Pro Air
BTC
255.00T
14.9W/T
$3.35
63.90%
$55,938.32
SEALMINER A2 Pro Hyd
BTC
530.00T
14.9W/T
$6.95
63.93%
$55,966.93
Antminer S21 Hyd
BTC
335.00T
16.0W/T
$3.82
68.62%
$60,075.90
SEALMINER A2 Air
BTC
240.00T
16.5W/T
$2.55
70.77%
$61,953.27
SEALMINER A2 Hyd
BTC
446.00T
16.5W/T
$4.74
70.77%
$61,953.27
WhatsMiner M63S
BTC
406.00T
18.5W/T
$3.05
79.35%
$69,462.76
WhatsMiner M60S
BTC
184.00T
18.5W/T
$1.38
79.35%
$69,462.76
Antminer T21
BTC
190.00T
19.0W/T
$1.28
81.49%
$71,340.13
Avalon A1466i
BTC
170.00T
19.5W/T
$1.00
83.76%
$73,327.93
Antminer S19k Pro
BTC
120.00T
23.0W/T
$0.06
98.65%
$86,359.10
Antminer S19XP
BTC
141.00T
23.0W/T
$0.06
98.86%
$86,545.51
Whatsminer M53s
BTC
270.00T
26.0W/T
$-1.13
111.51%
$97,623.33
WhatsMiner M50
BTC
120.00T
29.0W/T
$-1.06
124.38%
$108,887.57
Antminer S19j Pro
BTC
104.00T
29.5W/T
$-1.00
126.53%
$110,764.94
WhatsMiner M30S++
BTC
108.00T
31.0W/T
$-1.29
132.96%
$116,397.05

Popular Cloud Hash Rate Plan

Antminer S19Pro Plan

180Days | 50T

$26.00

Current price

0.00%

Static Output

Antminer S19Pro Plan

30Days | 10T

$1.00

Current price

0.00%

Static Output

Mining News

Hut 8 Signs $7B, 15-Year AI Data Center Lease Backed by Google

Bitcoin mining firm Hut 8 has signed a 15-year lease worth approximately $7 billion to deliver 245 megawatts of AI data center capacity at its River Bend campus in Louisiana. Infrastructure provider Fluidstack will lease the capacity, while Google will act as a financial backstop, guaranteeing lease payments and related obligations if needed. Hut 8 said construction is already underway, with the first data hall expected to be completed and commissioned in Q2 2027, followed by additional halls coming online thereafter.

2025.12.17 · Hut 8

Tajikistan Criminalizes Illegal Electricity Use for Crypto Mining

On Dec. 3, 2025, Tajikistan’s parliament approved amendments to the criminal code that make the illegal use of electricity for cryptocurrency mining a criminal offense. The new Article 253(2) targets miners using stolen or unmetered power to produce virtual assets. Offenders face fines ranging from $1,650 to $4,070, while coordinated group activity may result in higher fines or prison terms of two to five years. Large-scale or organized operations could face sentences of up to eight years in prison.

2025.12.15 · Cointelegraph

Bitdeer Boosts Hashrate to 45.7 EH/s as Bitcoin Output Triples Year Over Year

Bitdeer Technologies Group announced its November 2025 production and operations update, reporting a rise in self-mining hashrate to 45.7 EH/s following continued deployment of SEALMINER rigs. Bitcoin production reached 526 BTC during the month, representing a 251% increase year over year. On the hardware front, Bitdeer confirmed it is advancing two SEAL04 chip designs to ensure development success. The SEAL04-1 chip recently demonstrated approximately 6–7 J/TH power efficiency at the chip level under ultra-low-voltage conditions and is targeting mass production in Q1 2026, while SEAL04-2 development remains ongoing. Management said the company is on track to reach 50 EH/s by year-end 2025, alongside expanding its AI and GPU cloud capabilities.

2025.12.15 · Bitdeer

Bhutan Partners With Cumberland DRW to Build Digital Asset Infrastructure

Bhutan has signed a multi-year memorandum of understanding with crypto market maker Cumberland DRW to jointly develop digital asset infrastructure in Gelephu Mindfulness City (GMC). The partnership supports Bhutan’s long-term strategy to build a modern digital economy aligned with sustainability and strong governance principles. Cumberland will assist with Bitcoin reserve management, establish a local presence in GMC, hire Bhutanese talent and deploy industry experts to help develop local digital asset capabilities, strengthening the region’s financial and technological ecosystem.

2025.12.10 · Cumberland DRW

Bitcoin Hashrate Remains Above 1 ZH/s as Hashprice Rebounds

Bitcoin miners saw slight relief as hashprice recovered from multi-year lows, even as network hashrate continued to hold steady above 1 zettahash per second. After plunging to $36.35 per PH/s on Nov. 30 and hovering at $35.85 on Dec. 1, miner revenue began to rise with Bitcoin’s latest price uptick. As of the past day, hashprice climbed to roughly $39.79 per PH/s, easing pressure on miners who faced severe profitability compression. Despite the difficult weeks, the network’s computing power remained resilient, staying within the 1,050–1,100 EH/s range and signaling continued strength in mining participation.

2025.12.05 · hashrateindex.com